email us   |      site map

 

BUSINESS AREAS

Building Services

Commercial Developments

Conservation

Education

Energy and Renewables

Environmental

Health and Safety

Healthcare

Hotels

Industrial Pharma

Leisure and Amenity

Marine and Coastal

Project Management

Rail

Remedial Works

Roads and Bridges

Temporary Works

Traffic and Transportation

Water Services

leisure and amenity

 

Client: Tralee Town Council

Cost: Phase 1 - €700,000 + VAT Phase 2 – To be determined

Completion Date: Phase 1 – August, 2008 Phase 2 – At Design Stage

Description: A 1km long, 3 metre wide Amenity Boardwalk was constructed along the River Lee linking Ballard to Ballymullen, partly on a embankment and partly over a flood plain. The later section was supported by an existing wall and by columns. Phase 1 was completed in 2008 and Phase 2 is at design stage. Durability and the security of the Boardwalk were major factors in the choice of materials.

 

 
     Copyright © Malachy Walsh and Partners 2008 privacy policy | disclaimer